[1]
2016. DELAY OF AS-BUILT DRAWINGS SUBMISSION FOR MALAYSIAN TOLL HIGHWAY. Jurnal Teknologi. 78, 5-3 (May 2016). DOI:https://doi.org/10.11113/jt.v78.8516.