“DEVELOPING METHODOLOGY FOR CRADLE TO GRAVE COST PLANNING FOR INDUSTRIALISED BUILDING SYSTEM (IBS) IN MALAYSIA” (2015) Jurnal Teknologi (Sciences & Engineering), 77(16). doi:10.11113/jt.v77.6397.