[1]
2018. OPTIMIZATION OF TIME AND COST OF BUILDING COMPONENT MAINTENANCE: A CASE-STUDY IN A FIVE STAR HOTEL. Malaysian Journal of Civil Engineering. 25, 1 (Jun. 2018). DOI:https://doi.org/10.11113/mjce.v25.15836.