[1]
2018. POSSIBILITIES AND CHALLENGES IN IMPLEMENTATION OF TRANSIT ORIENTED DEVELOPMENT ALONG PROPOSED BRT CORRIDOR IN AN ALREADY DEVELOPED AND EXISTING CITY – CASE STUDY DHAKA-GAZIPUR BRT LINE, BANGLADESH. Malaysian Journal of Civil Engineering. 30, 2 (Aug. 2018). DOI:https://doi.org/10.11113/mjce.v30.16034.