(1)
OPTIMIZATION OF TIME AND COST OF BUILDING COMPONENT MAINTENANCE: A CASE-STUDY IN A FIVE STAR HOTEL. MJCE 2018, 25 (1). https://doi.org/10.11113/mjce.v25.15836.