OPTIMIZATION OF TIME AND COST OF BUILDING COMPONENT MAINTENANCE: A CASE-STUDY IN A FIVE STAR HOTEL. (2018). Malaysian Journal of Civil Engineering, 25(1). https://doi.org/10.11113/mjce.v25.15836