“A NEURAL NETWORK MODEL FOR PREDICTING THE TIME PERFORMANCE OF TRADITIONAL GENERAL CONTRACT (TGC) PROJECT” (2018) Malaysian Journal of Civil Engineering, 20(1). doi:10.11113/mjce.v20.15754.