“OPTIMIZATION OF TIME AND COST OF BUILDING COMPONENT MAINTENANCE: A CASE-STUDY IN A FIVE STAR HOTEL” (2018) Malaysian Journal of Civil Engineering, 25(1). doi:10.11113/mjce.v25.15836.