“MAXIMUM SCOUR DEPTH AT SUBMERGED SKEWED BRIDGE AND PIER”. Malaysian Journal of Civil Engineering, vol. 28, no. 1, Mar. 2018, https://doi.org/10.11113/mjce.v28.15702.