AWARENESS AND PREVALENCE OF INDUSTRIALIZED BUILDING SYSTEM (IBS) IN IRAN

Authors

  • Roohollah Taherkhani Department of Civil Engineering, Imam Khomeini International University (IKIU), 3414896818, Qazvin, Iran
  • A. L. Saleh Faculty of Civil Engineering (FKA), Universiti Teknologi Malaysia 81310 UTM Johor Bahru, Johor, Malaysia

DOI:

https://doi.org/10.11113/jt.v81.13364

Keywords:

Industrial building system (IBS), conventional building system, construction method, construction industry, Iran

Abstract

The introduction of modern technologies and development of building systems has influenced a fundamental transformation in many aspects of construction industry. However, still in major parts of building projects, conventional methods are being used in Iran. Traditional methods cause many problems such as project prolongation, low economic efficiency, too much stuff, and low quality of products. These shortcomings are more tangible in large-scale housing projects that require a vast domain of constructions; therefore, transformation from the current conventional building systems to the industrialized building systems (IBS) is needed more than ever. In order to this transformation it is vital that first the perceptions of the industry on these issues are adequately studied in this reseach. According to the lack of strategic plans and effective measures to promote IBS at country level, in addition to introducing the level of awareness and familiarity to IBS technical knowledge, the prevalence of both IBS components implementation and using IBS in different type of projects in Iran conducted. A likert based questionnaire was designed according to the level of awareness and the prevalence of IBS was evaluated applying the mean index and average ranking method. The results indicate that the prevalence of IBS in terms of components and types of projects is not at significant level. This paper provides an overview of IBS current state in Iran. Clearly, this awareness will prompt construction industry practitioners to a deeper exchange of ideas and promoting IBS in the future.

References

W. Parid. 1997. Global Trends in Research, Development and Construction. Proceedings of the International Conference on Industrialised Building System (IBS 2003).

A. Badir, Y. F., and Razali. 1998. Theory of Classification: Its Application and Badir-Razali Building Systems Classification. J. Inst. Eng. Malaysia.

M. S. S. Kamar, K. A. M., Hamid, Z. A., Azman, M. N. A., and Ahamad. 2011. Industrialized Building System (IBS): Revisiting Issues of Definition and Classification. Int. J. Emerg. Sci. 1(2): 120-132.

K. M. Nawi, M. N. M., Lee, A., and Nor. 2011. Barriers to Implementation of the Industrialised Building System (IBS) in Malaysia. Built Hum. Environ. Rev. 4: 22-35.

W. M. A. Azman, M. N. A., Ahmad, M. S. S., and Wan Hussin. 2012. Comparative Study on Prefabrication Construction Process. Int. Surv. Res. J. 2(1): 45-58.

M. N. M. Nawi, A. Lee, M. N. A. Azman, and K. A. M. Kamar. 2014. Fragmentation Issue in Malaysian Industrialised Building System (IBS) Projects. J. Eng. Sci. Technol. 9(1): 97-106.

N. A. Haron, I. S. Hassim, M. R. Abd. Kadir, and M. S. Jaafar. 2005. Building Cost Comparison Between Conventional and Formwork System: A Case Study of Four-storey School Buildings in Malaysia. Am. J. Appl. Sci. 2(4): 819-823.

N. Blismas and R. Wakefield. 2009. Drivers, Constraints and the Future of Offsite Manufacture in Australia. Constr. Innov. 9(1): 72-83.

A. Baharuddin, A. Rahman, and W. Omar. 2006. Issues and Challenges in the Implementation of Industrialised Building Systems in Malaysia. Proceedings of the 6th Asia-Pacific Structural Engineering and Construction Conference (APSEC 2006). September. 5-6.

E. N. Onyeizu and A. H. A. Bakar. 2011. The utilisation of Inustrialised Building System in Design Innovation in Construction Industry. World Appl. Sci. J. 15(2): 205-213.

K. A. M. Kamar, Z. A. Hamid, and M. Alshawi. 2010. The Critical Success Factors (CSFs) to the Implementation of Industrialised Building System (IBS) in Malaysia. CIB World Congress.

R. Taherkhani et al. 2012. The Bullwhip Effects in Industrialized Building System Supply Chains. Adv. Sci. Lett. 13: 811-812.

N. A. Haron and M. S. M. Rahim. 2013. Construction Cost Comparison Between Conventional and Formwork System for Condominium Project. Int. J. Adv. Stud. Comput. Sci. Eng. 2(5): 19-25.

R. Taherkhani. 2014. A Strategy towards Sustainable Industrial Building Systems (IBS): The Case of Malaysia. J. Multidiscip. Eng. Sci. Technol. 1(4): 86-90.

Y. Chang, X. Li, E. Masanet, L. Zhang, Z. Huang, and R. Ries. 2018. Unlocking the Green Opportunity for Prefabricated Buildings and Construction in China. Resour. Conserv. Recycl. 139: 259-261.

J. Hong, G. Q. Shen, Z. Li, B. Zhang, and W. Zhang. 2018. Barriers to Promoting Prefabricated Construction in China: A Cost–benefit Analysis. J. Clean. Prod. 172: 649-660.

C. S. P. L. Jaillon. 2008. Sustainable Construction Aspects of Using Prefabrication in Dense Urban Environment: A Hong Kong Case Study. Constr. Manag. Econ. 26(9): 953-966.

M. R. Hosseini, I. Martek, E. K. Zavadskas, A. A. Aibinu, M. Arashpour, and N. Chileshe. 2018. Critical Evaluation of Off-site Construction Research: A Scientometric Analysis. Autom. Constr. 87(October): 235-247.

M. A.-H. T. Salama, A. Salah, O. Moselhi. 2017. Near Optimum Selection of Module Conï¬guration for Efficient Modular Construction. Autom. Constr. 83: 316-329.

R. H. M. Arashpour, R. Wakeï¬eld, B. Abbasi, M. Arashpour. 2017. Optimal Process Integration Architectures in Off-site Construction: Theorizing the Use of Multi-skilled Resources. Arch. Eng. Des. Manag. 1-14.

A. S. M. A. Zakari, IbrahimAwal, R. Zakaria, A. H. Abdullah, and M. Z. Hossain. 2017. Application of Industrialized Building System A Case Study in Kano State, Nigeria. Int. J. GEOMATE. 13(39): 80-86.

M. R. Mohamed. 2018. The Issues and Challenges of Small and Medium-sized Contractors in Adopting Industrialised Building System. Int. J. Eng. Technol. 7(3.25): 432-436.

S. Navaratnam, T. Ngo, T. Gunawardena, and D. Henderson. 2019. Performance Review of Prefabricated Building Systems and Future Research in Australia. Buidings. 9(38).

M. Samari, N. Ghodrati, and M. W. M. Bin Shafiei. 2012. The Implementation of Industrialized Building System (IBS) in Iran Construction Companies. IOSR J. Mech. Civ. Eng. 1(3): 19-24.

H. Arbabian and N. B. Sarmadi. 2004. Improvement of Iranian Construction Industry. The 38th International Conference of Architectural Science Association ANZAScA. November: 396-403.

A. Hashemi. 2015. A Survey on the Current Status and Risks of Offsite Construction in Iran. J. Civ. Eng. Archit. 9: 141-152.

M. N. . Nawi, F. A. A. Nifa, S. Musa, and M. D. Sudirman. 2007. A Preliminary Survey of the Application of IBS in Malaysian Construction Industry: Barriers to implement in Kedah and Perli. Conference on Sustainable Building South East Asia. November: 5-7.

M. Dave, B. Watson, and D. Prasad. 2017. Performance and Perception in Prefab Housing: An Exploratory Industry Survey on Sustainability and Affordability. Procedia Eng. 180: 676-686.

W. G. Cochran. 1963. Sampling Techniques. New York: Wiley.

D. Corne and J. Knowles. 2007. Techniques for Highly Multiobjective Optimization: Some Non-dominated Points are Better than Others.

Y. N. Ishibuchi, H., N. Tsukamoto. 2008. Evolutionary Many-objective Optimization: A Short Review. 2424-2431.

J. L. Kukkonen, S. 2007. Ranking-dominance and Many Objective Optimization.

Kometa, S. T., P. O. Olomolaiye, and F. C. Harris. 1994. Attributes of UK Construction Clients Influencing Project Consultants’ Performance. Constr. Manag. Econ. 12: 433-443.

L. J. Cronbach. 1951. Coefficient Alpha and the Internal Structure of Tests. Psychometrika. 16: 297-334.

Downloads

Published

2019-09-22

Issue

Section

Science and Engineering

How to Cite

AWARENESS AND PREVALENCE OF INDUSTRIALIZED BUILDING SYSTEM (IBS) IN IRAN. (2019). Jurnal Teknologi, 81(6). https://doi.org/10.11113/jt.v81.13364