Lean Manufacturing Implementation Through Value Stream Mapping: A Case Study

Authors

  • Seyed Mojib Zahraee Faculty of Mechanical Engineering, Department of Industrial Engineering, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia
  • Ahmad Hashemi Faculty of Mechanical Engineering, Department of Industrial Engineering, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia
  • Ahmed Ali Abdi Faculty of Mechanical Engineering, Department of Industrial Engineering, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia
  • Ataollah Shahpanah Faculty of Mechanical Engineering, Department of Industrial Engineering, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia
  • Jafri Mohd Rohani Faculty of Mechanical Engineering, Department of Industrial Engineering, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia

DOI:

https://doi.org/10.11113/jt.v68.2957

Keywords:

Lean manufacturing, value stream mapping, waste, assembly line

Abstract

Lean Manufacturing (LM) is a business strategy that was developed in Japan. The main contribution of lean manufacturing is the identification and elimination of waste. Companies apply LM to sustain their competitiveness over their competitors by improving the manufacturing system’s productivity and quality enhancement of the product. The goal of this paper is to apply one of the most significant lean manufacturing techniques called Value Stream Mapping (VSM) to improve the production line of a company that produces several components for vehicle assembly line by decreasing the waste and non-value added activities.  First, the current value stream map of production line was developed using personal interviews, observations and secondary data of the company. Subsequently, the future value stream map was proposed based on the lean manufacturing principles to improve total production lead time and value added time. Based on the final result it can be concluded that VSM is a useful and applicable approach that can help managers conceptualize the different kind of wastes and defects. Final result showed that the production lead time and value added time improved up to nearly 80 % and 12 % respectively by eliminating the wastes based on lean principles and VMS method. 

References

Zahraee, S. M., Hatami, M., Mohd Yusof, N., Mohd Rohani, J., & Ziaei, F. 2013. Combined Use of Design of Experiment and Computer Simulation for Resources Level Determination in Concrete Pouring Process. Jurnal Teknologi. 64(1).

Zahraee, S. M., Hatami, M., Rohani, J. M., Mihanzadeh, H., & Haghighi, M. 2014. Comparison of Different Scenarios Using Computer Simulation to Improve the Manufacturing System Productivity: Case Study. Advanced Materials Research. 845: 770–774.

Abdullah, F., Rajgopal, J. 2003. Lean Manufacturing in the Process Industry. Proceedings of the IIE Research Conference, CD-ROM, Portland, OR, IIE, Norcross, GA.

Monden, Y. 1998. Toyota Production System—An Integrated Approach to Just-In-Time. Third ed. Engineering & Management Press, Norcross, Georgia.

Feld, W.M., 2000. Lean Manufacturing: Tools, Techniques, and How To Use Them. The St. Lucie Press, London.

Nahmias, S., 2001. Production and Operations Analysis. Fourth ed. McGraw Hill, New York.

Liker, J. K. 2004. The Toyota Way–14 Management Principles from the World’s Greatest Manufacturer. McGraw Hill, New York (USA). 27.

Womack, J. P. and Jones, D. T., 1996. Lean Thinking. Simon & Schuster, New York (USA). 29–49.

Rother, Mike and Shook, John. 2009. Learning to See–Value-Stream Mapping to Create Value and Eliminate Muda. Lean Enterprise Institute, Cambridge (USA). 1–4.

Lee, Brandon. 2001. Value Stream Mapping. 1, Lean Manufacturing-IMfgE at Wichita State University. Wichita, IE 780S.

Goriwondo, W. M., Mhlanga, S. and Marecha, A. 2011. Use of the Value Stream Mapping Tool for Waste Reduction in Manufacturing-Case Study for Bread Manufacturing in Zimbabwe. Proceedings of the International Conference on Industrial Engineering and Operations Management (ICIEOM 2011). Kuala Lumpur (Malaysia). 236–237.

Irani, Shahrukh A. and Zhou, Jin. 2000. Value Stream Mapping of Complete Product. OH 43210, Department of Industrial, Welding and Systems Engineering, The Ohio State University, Columbus (USA).

Garcia, Frank C. 2002. Using Value Stream Mapping as a Strategic Planning and Implementation Tool. Business Solutions & Engineering Services - Advent Design Corporation, Bristol (USA).

Chakravorty, S. S. 2010. An Implementation Model for Lean Programmes. European Journal of Industrial Engineering. 4(2): 228–248.

Ohno, Taiichi. 1988. Toyota Production System. Productivity Press, Portland.

Emiliani, M. L. 1998. Lean Behaviors. Management Decision. 36(9): 615–631.

Sondalini, Mike. 2012. How to do Value Stream Mapping. Lifetime Reliability Solutions browsed on 12th January, from www.lifetime-reliability.com.

Rother, M., Shook, J. 1999. Learning to See: Value Stream Mapping to Add Value and Eliminate Muda. The Lean Enterprise Institute, Inc., Brookline, MA.

Downloads

Published

2014-05-01

How to Cite

Lean Manufacturing Implementation Through Value Stream Mapping: A Case Study. (2014). Jurnal Teknologi (Sciences & Engineering), 68(3). https://doi.org/10.11113/jt.v68.2957