Critical Success Factors for Post Occupancy Evaluation of Hospital Building Performance
DOI:
https://doi.org/10.11113/jt.v71.3837Keywords:
Critical success factors (CSFs), post occupancy evaluation (POE)Abstract
This paper discusses the importance of critical success factors (CSFs) for post occupancy evaluation (POE) of hospital building performance. Recent failures of hospital buildings in delivering the expected service have raised the need for POE of their actual performance. However, POE of hospital building performance is a difficult undertaking and requires a vast amount of resources. Management, competencies, culture and awareness have been recognised as the factors that impede the success of POE projects. This demands the identification of the critical success factors (CSFs) that will enable POE projects to be undertaken without the success-impeding factors aforementioned, hence leading to successful POE projects. Despite the numerous studies on POE, the CSFs for POE have not been investigated. This leads to a knowledge gap of what are the actual CSFs that need to be considered in ensuring the success rate of hospital POE projects. By reviewing various related literatures, this paper attempts to generally look at the possibility of conducting a study on CSFs to ensure the success of hospital POE projects. This paper will eventually review the need for CSFs for POE of hospital building performance.References
(1) Mastor, S. H. and Ibrahim, N. 2010. Post Occupancy Evaluation Practices: A Procedural Model for A Successful Feedback. Proceedings of the CIB 2010 World Congress. 10–13 May. (2) Becker, F. D, and Sims, W. 1990. Assessing Building Performance. In The Total Workplace. New York: Van Nostrand Reinhold. 261–290. (3) Kooymans, R.R. and Haylock, P. 2006. Post Occupancy Evaluation and Workplace Productivity. In Proceedings of the 12th Pacific Rim Real Estate Society Conference. 22–25 January. Auckland.
(4) Riley, M., Moody, C. and Pitt, M. 2009. A Review of the Evolution of Post-Occupancy Evaluation as A Viable Performance Measurement Tool. 4th Annual Conference Liverpool BEAN.
(5) Zimring, C. 2002. Post Occupancy Evaluation: Issues and Implementation. Handbook of Environmental Psychology. John Wiley & Sons. Inc, New York.
(6) Preiser, W. F. E., Rabinowitz, H. Z. and White, E. T. 1988. Post-Occupancy Evaluation. Van Nostrand Reinhold. New York, NY. (7) Blackbird. 2009. Post Occupancy Evaluation Report: Washington Middle School. Washington Sustainable Schools Protocol – Post Occupancy Evaluation. August 2009. Rushing Blackbird. (8) Izran, S. M. 2011. Post Occupancy Evaluation of Building Performance in Malaysia. Doctor of Philosophy (Facilities Management). Universiti Teknologi Malaysia.
(9) Ng, B. H. and Zainal, A. A. 2012. Post Occupancy Evaluation: A Newly Designed Building Performance Survey Framework for Energy-Efficient Building. Management in Construction Research Association (MiCRA) Postgraduate Conference 2012. 5th December.
(10) Malin, N., Boehland, J. and Johson, K. 2003. Post Occupancy Evaluation: Learning Experience with Green Buildings. Environmental Building News. September. (11) Bordass, B. and Leaman, A. 2005. Making Feedback and Post Occupancy Evaluation Routine 3: Case Studies of the Use of Techniques in the Feedback Portfolio. Building Research and Information. 33(4): 361–375.
(12) Hewitt, D., Higgins, C., Healthy, P. and Turner, C. 2005. A Market Friendly Post Occupancy Evaluation: Building Performance Report. New Building Institute.
(13) Meir, I. A., Garb, Y., Jiao, D. and Cicelsky, A. 2009. Post Occupancy Evaluation: An Inevitable Step toward Sustainability. Advances in Building Energy Research. 3 : 189 – 220.
(14) Stevenson, F. 2008. Post Occupancy Evaluation of Housing. Corporate Social Responsibility (CSR) Conference. 15th January.
(15) Porkka, J., Huovila, P., Al-Bizri, S., Gray, C., Rijin, T. V., Klauw, R. V. D. and Vrijhoef, R. 2004. Decision Support Tools for Performance Based Building. PeBBu Research Report.
(16) Hamed Ganjbakhsh. 2010. Building Performance Diagnoses Using Post Occupancy Evaluation for Low Energy Office Building Practices. Master of Science (Construction Management). Faculty of Civil Engineering. Universiti Teknologi Malaysia, Skudai.
(17) Kennon, P. Bauer, J. and Parshall, S. 1988. Evaluating Health Care Facilities. Journal of Health. 6 (1988) : 819–831.
(18) Cohen, R., Standeven, M., Bordass, B. and Leaman. 1999. A. Final Report 1: Review of the PROBE Process. Retrieved September 11, 2013, on http://www.usablebuildings.co.uk
(19) Lackney, J. and Zajfen, P. 2005. Post Occupancy Evaluation of Public Libraries. Library Administration and Management. 19 (1) : 16–25.
(20) Then, D. S. S. 2005. Phase 6: Adaptive Reuse/ Recycling – Market Needs Assessment. In Assessing Building Performance. Elsevier Butterworth-Heinemann.
(21) Price, I. 2004. Business Critical FM. Facilities. 22(13/14) : 353–358.
(22) Riegel, C. 2007. Risk Assessment and Critical Infrastructure Protection in Health Care Facilities: Reducing Social Vulnerability. Federal Office of Civil Protection and Disaster Assistance.
(23) Carr, R. F. 2010. Hospital. Office of Construction and Facility Management (CFM).
(24) Rathi, K. 2004. Designing the 21st Century Hospital. Proceedings of the Centre of Health Design Conference. June 3.
(25) Nawawi, A. H. and Khalil, N. 2008. Post Occupancy Evaluation Correlated with Building Occupants’ Satisfaction: An Approach to Performance Evaluation of Government and Public Buildings. Journal of Building Appraisal. 4(2) : 59–69.
(26) Siti Norsazlina Haron, Md. Yusof Hamid and Annuar Talib. 2022. Exploration of Usability Issues in Malaysia Public Hospital Spatial Design: Pilot Study. International Journal of Applied Science and Technology. 1(4) : 127–134.
(27) Izran, S. M. 2012. Post Occupancy Evaluation: The Need for Awareness and Knowledge for Continuous Improvement of Building Performance. International Conference on Construction Industry, Facilities and Asset Management (ICCIFAM). Padang Sumatera Barat, Indonesia. November 22–23.
(28) Zuriati Ashaari. 2005. Current Practice of Post Occupancy Evaluation in Facility Management Organisation of Malaysia. Masters Dissertation. Universiti Teknologi Malaysia.
(29) Zimmerman, A. and Martin, M. 2001. Post Occupancy Evaluation: Benefits and Barriers. Building Research and Information. 29(2) : 168–174. (30) Izran, S. M., Hakim, A. M. and Shardy, A. 2007. Post Occupancy Evaluation: The Answer for the Sustainability of Malaysia’s Built Environment. Proceedings of the International Conference on Built Environment in Developing Countries. December 3–4. Universiti Sains Malaysia.
(31) Vischer, J. 2001. Post Occupancy Evaluation: A Multifaceted Tool for Building Improvement. In Learning From Our Buildings: A State of The Practice Summary of Post Occupancy Evaluation. Federal Facilities Council Technical Report No. 45. Washington: National Academy Press.
(32) Norazmi Bakar 2009. Kerangka Penghasilan Parameter Penilaian Selepas Dihuni di Bangunan Pejabat Kerajaan. Master of Science (Facilities Management). Universiti Teknologi Malaysia.
(33) SCI-Network (Sustainable Construction and Innovation through Procurement). 2012. Post Occupancy Evaluation: An Insight into Current POE - related Policies and Practices by European Public Authorities to Drive Sustainable Construction and Innovation. 1. June 2012.
(34) Cooper, I. 2001. Post-occupancy Evaluation – Where Are You? Building Research and Information. special issue: Post-occupancy Evaluation. 29(2) : 158–63.
(35) Meir, I. A., Garb, Y., Jiao, D. and Cicelsky, A. 2009. Post Occupancy Evaluation: An Inevitable Step toward Sustainability. Advances in Building Energy Research. 3 : 189–220.
(36) Vandenberg, M. 2006. Post Occupancy Evaluation: Incorporating Hindsight to Facilitate Foresight.
(37) Federal Facilities Council. 2001. Learning from Our Buildings: A State of the Practice Summary of Post Occupancy Evaluation. Federal Facilities Council Technical Report No. 145. National Academy of Science.
(38) Zimring, C. 2001. Post Occupancy Evaluation Processes in Six Federal Agencies. In Learning From Our Buildings: A State of The Practice Summary of Post Occupancy Evaluation. Federal Facilities Council Technical Report No. 45. Washington: National Academy Press.
(39) Preiser, W. F. E. 2002. Learning from Our Buildings: A State of the Practice Summary of Post Occupancy Evaluation. National Academy Press, Washington, DC. Available at: http://www.nap.edu/books/catalog/10288.html (accessed 3rd October 2012).
(40) Spot, M. D. 2006. What is Building Performance Evaluation? Ecosmart. Available at: http://www.ecosmart.ca/Docs/WhatisBPE.pdf (accessed 26th March 2013).
(41) Rockart, J. F. 1979. Chief Executives Define Their Own Data Needs. Harvard Business Review. Mar-April : 85.
(42) Janice, M. Roehl-Anderson. 2010. IT Best Practices for Financial Managers. John Wiley & Sons.
(43) Dobbins, J. A. and Donnelly, R. G. 1998. Summary Research Report on Critical Success Factors in Federal Government Program Management. Acquisition Review Quarterly-Winter 1998. 61–82.
(44) Peffers K., Gengler C. and Tuunanen T. 2003. Extending Critical Success Factors Methodology to Facilitate Broadly Participative Information Systems Planning. Journal of Management Information Systems. 20(1) : 51–85.
(45) Rohaniyati Salleh. 2009. Critical Success Factors of Project Management for Brunei Construction Projects: Improving Project Performance. Doctor of Philosophy. School of Urban Development, Faculty of Built Environment and Engineering, Queensland University of Technology.
(46) Mat Naim Abdullah. 2012. A Structured Critical Success Factors Model for Implementing Project Quality Management System in Construction. Doctor of Philosophy. Universiti Teknologi Malaysia.
(47) Jha, K. N. and Iyer, K. C. 2006. Critical Factors Affecting Quality Performance in Construction Projects. Total Quality Management and Business Excellence. 17(9) : 1155–1170.
(48) Huang, T. 2010. Dynamic Quality Management in Complex Construction Projects. Proceedings of the 2010 Industrial Engineering Research Conference.
(49) Hoonakker, P., Carayon, P. and Loushine, T. 2010. Barriers and Benefits of Quality Management in the Construction Industry: An Empirical Study. Total Quality Management and Business Excellence. 21(9) : 953–969. (50) Yasin, M. F. M. and Egbu, C. C. 2010. Harnessing Knowledge Management in the Process of Performance Evaluation of Facilities in Malaysia: A Critical Success Factor. CIB World Congress 2010. 10-13 May 2010. The Lowry, Salford Quays, United Kingdom.
(51) Kuan, Y. W. 2005. Critical Success Factors for Implementing Knowledge Management in Smaa and Medium Enterprises. Industrial Management and Data Systems. 105(3) : 261–279.
(52) Yu, A. T. W., Shen, Q., Kelly, J. and Hunter, K. 2006. Investigation of Critical Success Factors in Construction Project Briefing by Way of Content Analysis. Journal of Construction Engineering and Management, ASCE. 132(11) : 1178–1186.
(53) Shenhar, A., Levy, O. and Dvir, D. 1997. Mapping the Dimensions of Project Success. Project Management Journal. 28(2) : 5–13.
(54) Martin, C. C. 1976. Project Management. Amarco, New York P. Delphi Revisited: Expert Opinion in Urban Analysis. Urban Studies. 24 : 217–225.
(55) Locke, D. 1984. Project Management. St. Martins Press, New York. (56) Baker, B. N., Murphy, D. C. and Fisher, D. 1988. Factors Affecting Project Success. International Project Management Handbook ed. D. I. Cleland and W. R. King 2nd edition 902-919, New York.
(57) Sayles, L.R. and Chandler, M.K. 1971. Managing Large Systems. New York: Harper & Row.
(58) Pinto, J. K. and Selvin, D. P. 1988. Critical Success Factors Across the Project Life Cycle. Project Management Journal. 19(3) : 67–75.
(59) Morris, P. W. and Hough, G. H. 1987. The Anatomy of Major Projects. John Wiley & Sons, New York. (60) Aqlima, N. R. 2012. Factors Thwarting the Implementation of Post Occupancy Evaluation in Malaysia. Master Research Project. Universiti Teknologi Malaysia.
(61) Hadjri, K. and Crozier, C. 2009. Post-occupancy Evaluation: Purpose, Benefits and Barriers. Facilities. 27(1) : 21–33.
(62) Zulkarnain, S. H., Zawawi, E. M. A., Rahman, M. Y. A. and Mustafa, N. K. F. 2011. A Review of Critical Success Factor in Building Maintenance Management Practice for University Sector. World Academy of Science, Engineering and Technology. 77 : 2011. (63) Bullen, C. V. and Rockart, J. F. 1981. A Primer on Critical Success Factors. Center for Information Systems Research, Sloan School of Management. Massachusetts Institute of Technology.
(64) Takim, R., Akintoye, A. and Kelly, J. 2004. Analysis of Measures of Construction Project Success in Malaysia. In Khosrowshahi, F. (Ed.). Proceedings of the 20th Annual ARCOM Conference, Heriot Watt University, 1-3 September, Association of Researchers in Construction Management. 2 : 1123–1133.
(65) Yu, J. H. and Kwon, Hae-Rim. 2011. Critical Success Factors for Urban Regeneration Projects in Korea. International Journal of Project Management. 29 (2011) : 889–899. (66) Caralli, R. A. 2004. The Critical Success Factor Method: Establishing a Foundation for Enterprise Security Management (CMU/SEI-2004-TR-010). Software Engineering Institute. Carnegie Mellon University.
Downloads
Published
Issue
Section
License
Copyright of articles that appear in Jurnal Teknologi belongs exclusively to Penerbit Universiti Teknologi Malaysia (Penerbit UTM Press). This copyright covers the rights to reproduce the article, including reprints, electronic reproductions, or any other reproductions of similar nature.