SUPPLY CHAIN TECHNOLOGY UTILIZATION IN MALAYSIA CONSTRUCTION INDUSTRY

Authors

  • Zulkifli M. Udin School of Technology Management and Logistics, Universiti Utara Malaysia, 06010 UUM Sintok, Kedah Darulaman, Malaysia
  • Abdul Aziz Othman School of Technology Management and Logistics, Universiti Utara Malaysia, 06010 UUM Sintok, Kedah Darulaman, Malaysia
  • Azhar Ahmad School of Technology Management and Logistics, Universiti Utara Malaysia, 06010 UUM Sintok, Kedah Darulaman, Malaysia

DOI:

https://doi.org/10.11113/jt.v77.6044

Keywords:

Supply chain technology, supply chain management, construction, rasch method, Malaysia

Abstract

Supply Chain Technology (SCT) utilization becomes a phenomenon in the construction industry nowadays. The uses of these technologies have shown an improvement in construction business process particularly in planning and designing processes. These improvements significantly affect the performance of Supply Chain Management (SCM) in construction industry. The construction industry is critical for national wealth creation particularly in the developing countries such Malaysia. However, about five percent of construction projects were not able to be completed due to various reasons. Therefore, there is a great interest to find out the level of utilization of SCT within the construction industry, which is believed as a main driver to improve the SCM performance and directly reflect to the construction project performance. The objective of this paper is to identify and highlight the issues and problems associated with the current SCM practices, particularly in the technology utilization among the major players in the Malaysian construction industry.  To be more specifically, the type of application system that is being utilized in the Malaysian construction supply chain process will be identified.

References

Kamaruddin, N. K., & Udin, Z. M. 2009. Supply Chain Technology Adoption In Malaysian Automotive Suppliers, Journal of Manufacturing and Technology Management (JMTM). 20(3).

Asplund, E., Danielson, U. 1991. Räta ut Byggsvängen (Straightening the Building Roundabout). SBUF, Stockholm

Wegelius-Lehtonen, T., Pahkala, S., Nyman, H., Vuolio, H., Tanskanen, K., 1996. Opas Ratertamisen logistiikkaan (Guidelines for Construction logistics). Rakennusteollisuuden Keskusliitto, Helsinki.

Kornelius, L. & Wamelink, J. W. F. 1998. "The Virtual Corporation: Learning From Construction", Supply Chain Management: An International Journal. 3(4): 193 - 202

Vollman, T., Cordon, C., Raabe, H. 1997. Supply chain management. In: Mastering Management. FT Pitman, London. 316–322

Vrijhoef, R., and Koskela, L. 2000. “The Four Roles Of Supply Chain Management In Construction.†European Journal of Purchasing and Supply Management. 3-4(6): 169-178.

O'Brien, M. J. and Al-Biqami, N. 1998. Virtual Enterprises In Practice. Objects, Components And The Virtual Enterprise, An Interdisciplinary Workshop at OOPSLA 98, Vancouver, CA.

Love, P. E. D., Irani, Z. & Edwards, D. J., 2004. "A Seamless Supply Chain Management Model For Construction", Supply Chain Management: An International Journal. 9(1): 43 – 56

Udin, Z. M., Khan, M. K., & Zairi, M. 2006b. A Collaborative Supply Chain Management: Part 2 - The Hybrid Kb/Gap Analysis System For Planning Stage, Business Process Management Journal (BPMJ). 12(5): 671-687.

Lee J. Krajewski, Larry P. Ritzman. 1999. Operations Management: Strategy and Analysis, Addison-Wesley.

Burgess, R. 1998. “Avoiding Supply Chain Management Failure: Lessons From Business Progress Re-Engineering,†International Journal of Logistic Management. 9(1): 15-23.

Davenport, T. H., & Short J. E. 1990. The New Industrial Engineering: Information Technology And Business Process Redesign, Sloan Management Review, Summer.

Mulani & Lee. 2002. New Business Models For Supply Chain Excellence Achieving Supply Chain Excellence Through Technology. San Francisco: Montgomery Research, Inc., 14-18.

Udin, Z. M., Khan, M. K. & Zairi, M. 2006. “A Collaborative Supply Chain Management Framework: Part 1 – Planning Stageâ€, Business Process Management Journal. 12(3): 361-376

Mentzer, J. T., Foggin, J. H., & Golicic, S. L. 2000. Collaboration: The enablers, impediments, and benefits. Supply Chain Management Review, (September/October)

Ismail, A. Rashid, K. Hilo, W. 2009. The Use of Project Management Software in Construction Industry. Journal of Applied Sciences. 9(10): 1985-1989

Downloads

Published

2015-11-01

How to Cite

SUPPLY CHAIN TECHNOLOGY UTILIZATION IN MALAYSIA CONSTRUCTION INDUSTRY. (2015). Jurnal Teknologi (Sciences & Engineering), 77(4). https://doi.org/10.11113/jt.v77.6044