PERBEZAAN DALAM PENGGUNAAN JENTERA DAN MESIN BAGI KAEDAH PEMBINAAN SECARA KONVENSIONAL DAN SISTEM PEMBINAAN BERINDUSTRI (IBS)

Authors

  • Mohamed Nor Azhari Azman Fakulti Pendidikan Teknikal dan Vokasional, Universiti Pendidikan Sultan Idris, 35900 Tanjong Malim, Perak
  • Fardila Mohd Zaihidee Fakulti Pendidikan Teknikal dan Vokasional, Universiti Pendidikan Sultan Idris, 35900 Tanjong Malim, Perak
  • Ramlee Mustapha Fakulti Pendidikan Teknikal dan Vokasional, Universiti Pendidikan Sultan Idris, 35900 Tanjong Malim, Perak
  • Mohd Nasrun Mohd Nawi Pusat Pengajian Pengurusan Teknologi dan Logistik, Kolej Perniagaan , Universiti Utara Malaysia, 06010 Sintok, Malaysia.
  • Khuan Wai Bing Fakulti Pengurusan dan Ekonomi, Universiti Pendidikan Sultan Idris, 35900 Tanjong Malim Perak
  • Nurul Fadly Habidin Fakulti Pengurusan dan Ekonomi, Universiti Pendidikan Sultan Idris, 35900 Tanjong Malim Perak

DOI:

https://doi.org/10.11113/jt.v77.6059

Keywords:

Industrialised building system, machinery, conventional method, construction, foreign labor

Abstract

Use of machinery and machine extensively in the construction industry could increase construction productivity in terms of time, energy and costs and thereby to reduce dependence on foreign labour.  Construction Industry Development Board has drawn up a strategic plan of using the Industrialised Building System (IBS) in both government and private sector to promote construction practices in the use of machinery and machine optimally. Therefore, this study was aimed to investigate the differences in the use of machinery and engines for conventional construction methods and IBS. The instrument consists of interview and focus group protocols. The findings found that there are two types of machines that were frequently used in the construction which included mobile cranes and backhoe, where IBS used modular components such as walls, floors, beams and columns. Modular components are heavy and large size which required the use of machinery and this could reduce the use of foreign labour. Using IBS, the completion of construction projects was within half or a third of the time of conventional construction period. This allows the contractor to add new construction projects and this could increase construction productivity.

References

MITI. 2014. MITI Report. Selangor, Malaysia.

W. Alaghbari, M. R. A. Kadir, A. Salim, Ernawati. 2007. The Significant Factors Causing Delay Of Building Construction Projects In Malaysia. Engineering, Construction and Architectural Manageme.n.14: 192-206.

B. K. Fishbein. 1998. Building For The Future: Strategies To Reduce Construction And Demolition Waste In Municipal Projects. Inform, Inc.

M. N. A. Azman, F. Mohd Zaihidee, M. Nawi, M. Nasrun, M. Kamar, K. Anuar, Z. Abd Hamid, R. Mustapha, W. B. Khuan, T. K. Tee. 2014. Status dan Tahap Penggunaan Jentera dan Mesin di Kalangan Kontraktor G7 di Malaysia. Jurnal Teknologi. 70: 137-145.

M. N. E. Ajis, M. N. Saludin, A. Ismail, O. F.V. Feigenblatt, M. S. Shuib, M. F. Keling. 2010. Managing Foreign Workers In Southeast Asian Countries. Journal of Asia Pacific Studies. 1:. 481-505.

CIDB. 2005. Road Map Sistem Binaan Berindustri (IBS) 2003-2010. Construction Industry Development Board Malaysia, Kuala Lumpur.

M. S. Misnan, A. H. Mohammed, Z. M. Yusof, R. A. Hamid, N. Othman, W. Y. W. Mahmood. 2006 . Isu-isu Semasa Pengurusan Keselamatan dan Kesihatan Pekerjaan dalam Industri Pembinaan Malaysia in Proceedings of the International Conference on Const uction Industry.

M. N. A. Azman, K. A. M. Kamar, M. N. M. Nawi. 2013. Industrialised Building System in Reducing Waste of Construction Industry. Journal of Science and Technical Education. 2: 96-103.

K. A. M. Kamar, Z. A. Hamid, M. N. A. Azman, M. S. S. Ahamad. 2011. Industrialized Building System (IBS): Revisiting Issues of Definition and Classification. International Journal of Emerging Sciencez. 1:120-132.

CIDB. 2003. Industrialised Building System (IBS) Roadmap 2003-2010. Construction Industry Development Board (CIDB), Kuala Lumpur.

D. N. Trikha, A. A. A. Ali. 2004. Industrial Building Systems: Universiti Putra Malaysia Press. Construction Industry Development Board (CIDB).

M. N. A. Azman, K. A. M. Kamar, M. N. M. Nawi, A. Alarif, M. Albakri, R. Mustapha, K. W. Bing, Z. A. Hamid, T. T. Kiong. 2013. Review Machinery and Machine Used in Construction Site presented at the IEEE Symposium on Business, Engineering and Industrial Applications.

JPM. 2010. "Labour Force Survey: Employment," Jabatan Perangkaan Malaysia.

R. Mahbub. 2011. Readiness of a Developing Nation in Implementing Automation and Robotics Technologies in Construction: A Case Study of Malaysia presented at the Sixth International Conference on Construction in the 21st Century (CITCVI 2011) Kuala Lumpur, Malaysia.

K. A. M. Kamar, Z. A. Hamid, N. Dzulkalnine. 2012. Industrialised Building System (IBS) Construction: Measuring the Perception of Contractors in Malaysia in Business Engineering and Industrial Applications Colloquium (BEIAC), 2012 IEEE.

M. N. Mohd Nawi, M. N. A. Azman, K. A. Mohamad Kamar, Z. Abd Hamid. 2013. Kajian Terhadap Penggunaan IBS dalam Projek Swasta di Kawasan Lembah Klang. Jurnal Teknologi. 65: 9-15.

M. R. A. L. Kadir, W. P. Jaafar, M. S. Sapuan, S. M. Ali, A. A. A. 2006. Construction Performance Comparison Between Conventional and Industrialised Building Systems in Malaysia. Structural Survey.24: 412-424.

CIDB. 2005. IBS Digest. Construction Industry Development Board, Kuala Lumpur. 3-10.

K. A. M. Kamar, Z. A. Hamid, Z. Ismail. 2010 Modernising The Malaysian Construction Industry through the Adoption of Industrialised Building System (IBS) presented at the The Sixth International Conference On Multi National Joint Ventures For Construction Works, Kyoto, Japan.

M. N. A. Azman, T. A. Majid, M. S. S. Ahamad, M. H. Hanafi. 2011. A Study on the Trend of the Use of IBS Components and the Setting up of IBS Manufacturing Factories in the Malaysian Construction Industry. Malaysian Construction Research Journal. 9: 18-30.

M. N. M. Nawi, W. N. Osman, A. I. Che-Ani. 2014. Key Factors For Intergrated Project Team Delivery: A Poposed Study In IBS Malaysian Construction Projectm. Advance Enviromental Biology.8(5): 1868-1872.

Downloads

Published

2015-11-01

How to Cite

PERBEZAAN DALAM PENGGUNAAN JENTERA DAN MESIN BAGI KAEDAH PEMBINAAN SECARA KONVENSIONAL DAN SISTEM PEMBINAAN BERINDUSTRI (IBS). (2015). Jurnal Teknologi, 77(4). https://doi.org/10.11113/jt.v77.6059