INVENTORY RISK BASED TECHNIQUE FOR SPARE PARTS UTILIZATION

Authors

  • Kamal Imran Mohd Sharif School of Technology Management & Logistics, Universiti Utara Malaysia, 06010 Sintok, Kedah, Malaysia
  • Jafni Azhan Ibrahim School of Technology Management & Logistics, Universiti Utara Malaysia, 06010 Sintok, Kedah, Malaysia
  • Zulkifli M Udin School of Technology Management & Logistics, Universiti Utara Malaysia, 06010 Sintok, Kedah, Malaysia

DOI:

https://doi.org/10.11113/jt.v77.6123

Keywords:

Inventory management, risk based technique, spare parts, risk quantification, binary decision diagram

Abstract

The equipment breakdown due to unavailability of spare parts has incurred challenges for the manufacturing industry in managing the inventory. Consequently, the problem of spare parts unavailability has lead the organization towards unproductive and eventually impact the financial performance. Therefore, maintaining good system has direct connection with spare parts availability. The inventory planner always strive hard to ensure that the spare parts are always available for the maintenance used. Nevertheless, maintaining high inventories of spare parts often conflict from meeting the needs of equipment reliability for the manufacturing plant. In view of this situation, management of spare parts become critical in ensuring   the equipment reliability. This paper describes an innovative risk quantification technique using Binary Decision Diagram (BDD) for the spare parts inventory control. The technique modified the BDD concept by translating the failure history into binary decision. From the binary process, the data will be converted into spare parts probability table and failure impact is analyzed.  These two functions of risk, will be calculated in order gain the risk in monetary value.

References

Dhillion, B. (2002). Engineering Maintenance, A Modern Approach. New York: CRC Press.

Sullivan, G. P., Pugh, R., Melendez, A. P., & Hun, W. (2010). Operations & Maintenance. Federal Energy Management Program.

Scott, S., & Consultant, S. (2004). Annual International Supply Management Conference, April 2004, (April), 1–3.

Van Horenbeek, A., Buré, J., Cattrysse, D., Pintelon, L., Vansteenwegen, P. (2013). Joint Maintenance And Inventory Optimization Systems: A Review. International Journal of Production Economics, 143(2), 499–508. doi:10.1016/j.ijpe.2012.04.001

Ibrahim, J. A., Kamal, I. M. S., Udin, Z. M., & Hasni, N. (2015). Risk Based Prediction Technique on Critical Spare Parts Requirement for Plant Producer. Journal of Engineering and Applied Sciences. 10(3), 1338–1344.

Khan, F. I., & Haddara, I. (2004). Risk-Based Maintenance (RBM): A New Approach For Process Plant Inspection And Maintenance. Process Safe, 252-265.

Arunraj, N. S., & Maiti, J. (2007). Risk-Based Maintenance—Technique Sand Applications. Journal of Hazardous Materials, 653-661.

Brown, S. J., & May, I. J. (2003). Risk-Based Hazardous Protection and Prevention By Inspection And Maintenance. J.Press. Ves.Technology, 362-367.

Carter, D. A., Hirst, I. L., Maddison, T. E., & Porter, S. R. (2003).Appropriate Risk Assessment Methods For Major Accident Establishments. Process System Risk Management. 12-18.

Balemans. (1974). Check-list Guide Line for Safe Design of Process Plant. First international Loss Prevention Symposium, 7-33.

Rogers, R.L. (2000). The RASE Project Risk Assessment Of Unit Operations and Equipment, http://www.safetynet.de/EC-Projects/. Pp.1-50.

Pumfrey, D. J. (1999). The Principled Design of Computer System Safety Analysis. 11-219.

Wall K. D (2011) The Kaplan and Garrick Definition of Riskand its Application to Managerial Decision Problems: DRMI, Naval Postgraduate School.

C.Y. Lee. (1959) Representation Of Switching Circuits By Binary Diagrams. Bell System Technical Journal, 38:985-999.

Zadeh, L. (1965) Fuzzy sets, Information and Control, 8, 338

Downloads

Published

2015-11-05

How to Cite

INVENTORY RISK BASED TECHNIQUE FOR SPARE PARTS UTILIZATION. (2015). Jurnal Teknologi, 77(5). https://doi.org/10.11113/jt.v77.6123