TOWARDS DESIGNING MODULAR OF INDUSTRIALIZED BUILDING SYSTEMS

Authors

  • Mohsen Delfani Department of Architecture, Faculty of Design and Architecture, University Putra Malaysia, 43400, Malaysia
  • Rahinah Ibrahim Department of Architecture, Faculty of Design and Architecture, University Putra Malaysia, 43400, Malaysia
  • Mohammad Yazah Mat Raschid Department of Architecture, Faculty of Design and Architecture, University Putra Malaysia, 43400, Malaysia
  • Farzad Hejazi Department of Civil, Faculty of Engineering, University Putra Malaysia, 43400, Malaysia
  • Nuzul Azam Haron Department of Civil, Faculty of Engineering, University Putra Malaysia, 43400, Malaysia

DOI:

https://doi.org/10.11113/jt.v78.8342

Keywords:

IBS, Modular Design Process, Standardization, Sustainable Design Informatics, Design Integration

Abstract

Although applying industrialization methods on the construction industry is well-documented as one of the best solutions of high housing demands, implementation progress of industrialized building system (IBS) rather slow is picking up due to barriers associated with complexity of its design stage. The paper presents an extant literature survey focusing on application of modular design process on IBS projects to benefit from abstraction of design process of these projects in order to facilitate the industrialization process of the construction industry. Results indicate that designing based on modularization could assist design process of IBS projects so that it prevents emerging conflicts in IBS life span that is rooted in IBS design stage. The study is presently expecting to improve awareness in various phases of IBS projects regarding the significance contributions of Modular Design Method as a respond to the complexity of IBS design method.

References

A. Kazi, M. Hannus, S. Boudjabeur, and A. Malone. 2007. Open Building Manufacturing: Core Concepts and Industrial Requirements.

F. Ismail and A. Mustafa. 2013. Issues in Managing Construction Phase of IBS Projects. Procedia-Social Behav. Sci. 101: 81-89.

M. R. A. Kadir, W. P. Lee, M. S. Jaafar, S. M. Sapuan, and a. a. a. Ali. 2005. Factors Affecting Construction Labour Productivity For Malaysian Residential Projects. Struct. Surv. 23(1): 42-54.

C. Preece, L. S. Phen, R. Padfield, and E. Papargyropoulou. 2011. Developing And Marketing Sustainable Construction Services. In Management and Innovation for a Sustainable Built Environment MISBE 2011, Amsterdam, The Netherlands, June 20-23, 2011.

J. Raftery, B. Pasadilla, Y. H. Chiang, E. C. M. Hui, and B.-S. Tang. 1998. Globalization And Construction Industry Development: Implications Of Recent Developments In The Construction Sector In Asia. Constr. Manag. Econ. 16(6): 729-737.

M. R. A. Yoke, L.L., Hassim S., & Kadir. 2003. Computer-Based Cost Control Model for Industrialised Building System Construction. Int. Conf. Ind. Build. Syst. Kuala Lumpur, Malaysia.

M. S. J. and M. S. S. Thanoon, Lee Wah Peng, Mohd Razali Abdul Kadir. 2003. The Essential Characteristics Of Industrialised Building System. Int. Conf. Ind. Build. Syst. 10-11.

Y. F. Badir, M. R. A. Kadir, and A. H. Hashim. 2002. Industrialized Building Systems Construction in Malaysia. J. Archit. Eng. 8(1): 19-23.

P. Demian and D. Walters. 2013. The Advantages Of Information Management Through Building Information Modelling. Constr. Manag. Econ. 1-13.

M. Rollet. 1986. Modular Coordination In The Building Industry. In Toward industrialization in the building industry, Proc., UNESCO/FEISEAP Regional Workshop.

J. Eichert and A. S. Kazi. 2007. Vision And Strategy Of Manubuild–Open Building Manufacturing. Open Build. Manuf. Core concepts Ind. Requir. 3-14.

K. Barker. 2003. Review of Housing Supply: Securing Our Future Housing Needs: Interim Report: Analysis. HM Stationery Office.

W. Pan, A. G. F. Gibb, and A. R. J. Dainty. 2007. Perspectives of UK Housebuilders On The Use Of Offsite Modern Methods Of Construction. Constr. Manag. Econ. 25(2): 183-194.

K. A. M. Kamar, Zuhairi Abd Hamid, Mohamed Nor Azhari Azman, and M. S. S. Ahamad. 2011. Industrialized Building System (IBS): Revisiting Issues of Definition and Classification. Int. J. Emerg. Sci. 1(June): 120-132.

P. Piroozfar and E. Farr. 2013. Evolution of Nontraditional Methods of Construction: 21st Century Pragmatic Viewpoint. J. Archit. Eng. June: 119-133.

CIDB. 2003. IBS Roadmap 2003-2010. CIDB Publ.

N. Blismas. 2007. Off-Site Manufacture In Australia: Current State And Future Directions. Cooperative Research Centre for Construction Innovation.

E. Onyeizu, A. Hassan, and A. Bakar. 2011. The Utilisation of Inustrialised Building System in Design Innovation in Construction Industry. Appl. Sci. 15(2): 205-213.

J. S. Goulding, F. Pour Rahimian, M. Arif, and M. D. Sharp. New offsite Production And Business Models In Construction: Priorities For The Future Research Agenda. Archit. Eng. Des. Manag. 1-22.

Z. Hamid, K. A. M. Kamar, M. Zain, K. Ghani, and A. H. A. Rahim. 2008. Industrialized Building System (IBS) in Malaysia: the Current State And R&D Initiatives. Malaysian Constr. Res. J. 2(1): 1-11.

A. G. F. Gibb. 2001. Standardization And Pre-Assembly- Distinguishing Myth From Reality Using Case Study Research. Constr. Manag. Econ. 19(3): 307-315.

W. Thanoon and L. Peng. 2003. The Experiences Of Malaysia And Other Countries In Industrialised Building System. Build. Syst. JANUARY: 10-11.

N. Sadafi, M. F. M. Zain, and M. Jamil. 2012. Adaptable Industrial Building System: Construction Industry Perspective. J. Archit. Eng. 138(11): 1331-1340.

S. Jaganathan, L. J. Nesan, R. Ibrahim, and A. H. Mohammad. 2013. Integrated Design Approach For Improving Architectural Forms In Industrialized Building Systems. Front. Archit. Res. 2(4): 377-386.

N. G. N. Blismas, M. Pendlebury, A. Gibb, and C. Pasquire. 2005. Constraints to the use of off-site production on construction projects. Eng. Des. 1: 37-41.

M. Chiu. 2002. An Organizational View Of Design Communication In Design Collaboration. Des. Stud. 23: 187-210.

L. Koskela. 1992. Application of The New Production Philosophy To Construction.

D. Chua, A. Tyagi, S. Ling, and S. Bok. 2003. Process-Parameter-Interface Model For Design Management. Manag. December: 653-663.

A. G. F. Gibb. 2006. Off-Site Fabrication: Prefabrication, Pre-Assembly And Modularisation. John Wiley & Sons.

C. Peng. In-situ 3D Concept Design With A Virtual City. Des. Stud. 2(4): 439-455.

D. H. T. Walker. 2002. Enthusiasm, Commitment And Project Alliancing: An Australian Experience. Constr. Innov. Information, Process. Manag. 2(1): 15-31.

Downloads

Published

2016-04-18

Issue

Section

Science and Engineering

How to Cite

TOWARDS DESIGNING MODULAR OF INDUSTRIALIZED BUILDING SYSTEMS. (2016). Jurnal Teknologi (Sciences & Engineering), 78(5). https://doi.org/10.11113/jt.v78.8342