DELAY OF AS-BUILT DRAWINGS SUBMISSION FOR MALAYSIAN TOLL HIGHWAY

Authors

  • Mohd Nasir, S. R. Faculty of Civil Engineering , Universiti Teknologi MARA Shah Alam, Shah Alam, Selangor, Malaysia
  • Zahari, Z. Malaysian Highway Authority, Kajang, Selangor, Malaysia
  • Mat Isa, C. M. Faculty of Civil Engineering , Universiti Teknologi MARA Shah Alam, Shah Alam, Selangor, Malaysia
  • Che Ibrahim, C. K. Faculty of Civil Engineering , Universiti Teknologi MARA Shah Alam, Shah Alam, Selangor, Malaysia

DOI:

https://doi.org/10.11113/jt.v78.8516

Keywords:

Influence factor, delay and factor analysis

Abstract

Construction projects are difficult to be built exactly as stipulated in the original contract or construction drawings. Most of this agreement requires As-Built Drawings (ABD which represent construction modifications. Despite of the importance of ABDs, producing accurate and timely ABDs have been persistent problem in the construction industry including toll highway construction. This paper provides an integrated approach in analysing the influence factors to the delay of ABDs submission for Malaysian toll highway. A questionnaire survey was conducted to solicit the factors from authority, concessionaire/contractor and consultant viewpoint. This study identified the major factors that influence submission of ABDs. Factor Analysis is conducted in order to study the items correlation. The perspective of authority, concessionaire/ contractor and consultant has been analysed and ranked based on Relative Importance Index (RII). The findings indicate that six (6) component were classified as a  delay factors in submission of ABDs which includes: (1) field personnel skills and tools (2) data collection process skill (3) planning and coordination skills by project management team (4) financial capabilities (5) personnel interpersonal skills and competency (6) client related factor. The findings provide a conceptual studies in developing the submission framework for future research. 

References

MHA. 2014. As-Built Drawing Registration Book. Kajang: Department of Development And Project Monitoring MHA.

Gould, F. E. 2002. Managing the Construction Process: Estimating, Scheduling, and Project Control. New Jersey: Prentice Hall.

BEM. 2005. A Guide to Engineering Practices. Retrieved Mac 14, 2014, from http://www.bem.org.my.

Woo, J., Wilsmann, J., and Kang, D. 2010. Use Of As-Built Building Information Modelling. Construction Research Congress. 538-548.

Abdel-Monem, M., and Hegazy, T. 2013. Enhancing Construction As-Built Documentation Using Interactive Voice Response. Journal of Construction Engineering and Management. 13(7): 895-898.

Pettee, S. R. 2005. As-builts-Problems & Proposed Solutions. Construction Management Association of America.

Raynar, K. A. 1994. Integrating Computer Vision With Computer Aided Design To Produce Construction As-Built Drawings. ProQuest/Dissertations and Thesis; 1994; ProQuest Dissertations & Theses Full Text.

Bracewell, P. A., and Klement, U. R. 1983. The Use of Photogrammetry in Piping Design. Proceedings of the Institution of Mechanical Engineers. Part A. Power and Process Engineering. 97: 25-138.

Fisk, E. R. 2003. Construction Project Administration. 7thed. New Jersey: Prentice Hall.

Hamzah, N., Khoiry, M. A., Arshad, I., Tawil, N. M., and Che Ani, A. I. 2011. Causes Of Construction Delay - Theoretical Framework. Procedia Engineering. 20: 490-495.

Sekaran, U. 2003. Research Methods for Business A Skill Building Approach. New Jersey: John Wiley & Sons.

Krejcie, R. V., and Morgan, D. W. 1970. Determining Sample Size For Research Activities. Educational and Psychological Measurement. 30: 608.

Kometa, S. T., Olomolaiye, P. O., and Harris, F. C. 1994. Attributes Of U.K Construction Clients Influencing Project Consultants’ Performance. Construction Manage Form Econ. 12: 433-43.

Odeh, A. M., and Battaineh, H. T. 2002. Causes Of Construction Delay: Traditional Contracts. International Journal of Project Management. 20: 67-73.

Pallant, J. 2007. SPSS Survival Manual: A Step-By Step Guide To Data Analysis Using SPSS for Windows (Version 15). 3rd ed. Sydney : Allen & Unwin

Kaiser and Rise. 1974. Little jiffy, Educational and Psychological Measurement. 111–117.