THE CHALLENGES OF CONSTRUCTION WASTE MANAGEMENT IN KUALA LUMPUR
DOI:
https://doi.org/10.11113/jt.v78.8522Keywords:
Construction waste management (CWM), suitable method of CWM, factor influence CW, implementing CWMAbstract
Rapid growth in construction activities in Kuala Lumpur resulted in increasing of construction waste problems. Construction waste gives a negative impact to the environment, cost, time, productivity and social of the country. This paper studies the challenges of construction waste management faced by the contractors undertake projects in Kuala Lumpur. Eighty five (85) numbers of questionnaires were distributed to various groups of respondents which include main contractors, registered contractor for collection of waste, Kuala Lumpur City Hall (DBKL) officers and Solid Waste Corporation (SWCorp) officers. Spearman’s rank correlation coefficient analysis, mean ranking analysis, Kruskal-Wallis test, and factor analysis are among the analysis used in this study. In addition correlation test were also conducted to establish the correlation between the factors. The result shows that the factor influenced in successful implementation of Construction waste management (CWM) for DBKL projects are internal factor, management factors, local authority factor and law regulation. The findings also show that the barrier in implementing CWM in DBKL projects is due to the lack of authority to monitor the management of construction waste on site. The findings of this study highlight the scenario of the current CWM for projects in Kuala Lumpur and thus, provide the recommendation in improving the CWM in Kuala Lumpur.
References
Agamuthu, P. 2009. Challenges In Sustainable Management Of Construction And Demolition Waste. Waste Management Resources. 26: 91.
Agamuthu, P., Ganesh, H., and Cashore, B. 2001, Solid Waste: Principle and Management with Malaysia Case Studies, Institute Biological Sciences, University of Malaya, Kuala Lumpur. 1: 56-67
Khairulzan, O. and Halim, Y. 2006. The International Conference on Civil and Environmental Engineering Sustainability (IConCEES), Thistle Hotel, Johor, Malaysia
Willian, H. 2005, Strategies for successful construction and demolition waste recycling operations. Constr. Manage. Economy. 15 (1): 49-58
Saeed, M, Chen, G. K., Long, K. S. and Hwang, G. H. 2012. Development Of Solid Waste Generation And Recyclable Component Rate Of Kuala Lumpur. Perspective study. 1-7.
Anonymous. 2014. Act Of Solid Waste Management. http://www.ppsppa.gov.my (29th September 2014.
SWCorp. 2014. Perbadanan Pengurusan Sisa Pepejal dan Pembersihan Awam Kementerian Kesejahteraan Bandar, PerumahandanKerajaanTempatan, 2014, Garispanduan: Pengurusansisapepejalpembinaan di tapakbina, Kementeriankesejahteraanbandar, perumahandanalamsekitar, Kuala Lumpur, Malaysia.
Sekaran, U. 2003. Research Methods for Business. Edition 1. Unites States of America: John Wiley & Sons.
Akintoye, A. 2000. Analysis of Factors Influencing Project Cost Estimating Practice. Journal of Construction Engineering and Management. 18(1): 77-89.
Vivian, W. Y. 2007. On the Effectiveness in Implementing a Waste Management Plan Method in Construction. Science Direct. 28: 1072-1080.
Poon, C. S., Yu, A. T. W., and Jaillon, L. 2004, Reducing Building Waste at Construction Sites in Hong Kong. Journal of Construction Management and Economics. 22: 61-70.
Yuan, H. P. and Shen, L. Y. 2011. Trend Of The Research On Construction And Demolition Waste Management. Waste Management Department. 31: 6-9.
Nagapan, S., Rahman, L. A. and Asmi, A. 2012. Construction Waste Management: Malaysia Persective, The International Conference on Civil and Environmental Engineering Sustainability (IConCEES), Thistle Hotel, Johor, Malaysia.
Seow, T. W. and Halim, A. 2003. Pengurusan Sisa Pembinaan Di Tapak Bina, Universiti Tun Hussein Onn Malaysia. 1: 1-10.
Pallant, J. 2007. SPSS Survival Manual: A Step-by Step Guide to Data Analysis Using SPSS for Windows (Version 15). Edition 3. Sydney: Allen &Unwin.
Kaiser and J.~Rice. 1974. Little jiffy, mark iv. Educational and Psychological Measurement. 34(1): 111-117.
Fauziah, S. H. and Agamuthu, P. 2013, Policy and Strategies Towards Sustainable Waste Management in Malaysia, Institute of Biological Science, Faculty of Science, University of Malaya, Kuala Lumpur, Malaysia. 1.
Nagapan, S., Abdul Rahman, I., Asmi, A., Memon, A. H., & Mohammad Zin, R. 2012. Identifying Causes of Construction Waste–Case of Central Region of Peninsula Malaysia. International Journal of Integrated Engineering. 4(2).
Downloads
Published
Issue
Section
License
Copyright of articles that appear in Jurnal Teknologi belongs exclusively to Penerbit Universiti Teknologi Malaysia (Penerbit UTM Press). This copyright covers the rights to reproduce the article, including reprints, electronic reproductions, or any other reproductions of similar nature.