Difficulties Encountered Whilst Drilling And Completing Deviated Wells

Authors

  • Dr.Abu Azam Md. Yassin

DOI:

https://doi.org/10.11113/jt.v10.971

Abstract

With the extremely high cost of developing offshore oilfield, several wells are started from a single platform and then highly deviated so that the well bottom out in the production zone in accordance with the required well spacing. The usage of highly deviated wells posed several problems relating to drilling and completing such wells. These problems and methods for elevating such problems will be discussed.

Downloads

Published

1987-05-11

Issue

Section

Science and Engineering

How to Cite

Difficulties Encountered Whilst Drilling And Completing Deviated Wells. (1987). Jurnal Teknologi (Sciences & Engineering), 10(1), 30-36. https://doi.org/10.11113/jt.v10.971