Scheduling And Cost Analysis Program For Project Management
DOI:
https://doi.org/10.11113/jt.v14.994Abstract
This article describes the important element involved in project management, especially the construction works. The methods are based on the network analysis techniques. The designed package is capable to perform the scheduling of the project's activities and the calculation of various costs involved. Besides those,the package also permits the end user to print or display various type of outputs and they are menu driven. Keyword: network analyis, activity scheduling, CPM (Critical Path Method), cost analysisDownloads
Published
1989-05-11
Issue
Section
Science and Engineering
License
Copyright of articles that appear in Jurnal Teknologi belongs exclusively to Penerbit Universiti Teknologi Malaysia (Penerbit UTM Press). This copyright covers the rights to reproduce the article, including reprints, electronic reproductions, or any other reproductions of similar nature.
How to Cite
Scheduling And Cost Analysis Program For Project Management. (1989). Jurnal Teknologi (Sciences & Engineering), 14(1), 1-4. https://doi.org/10.11113/jt.v14.994