Abstract

Quality in construction projects both in the past and in present has assumed critical importance due to frequent cases of failure. Quality in public construction projects in Nigeria is on the decline greatly due to underachievement in the construction management process. The aim of this study is to identify factors affecting quality in public construction projects in Borno state. In achieving the objective of the study, a questionnaire survey was conducted involving a sample size of 70 respondents, which include architects, engineers, quantity surveyors, and contractors. The importance index of each factor was calculated for all the professionals. Percentage rank agreement factor (PRAF) was used to measure agreement of the importance ranking among the professionals. The results show the most critical factors affecting quality in public construction projects in Borno state are; ‘lack of management commitment’, ‘poor teamwork among project participants’, ‘poor supervision by contractor’, ‘design changes and ‘poor training system’. Respond of the professionals’ perspective on factors affecting construction quality in public projects in Borno state is the very first important step in initiating methods and processes for improvement of quality in public construction projects in Borno state.

References

Adenikinju, A. F. (2003). Electric Infrastructure Failures in Nigeria: A Survey-Based Analysis of the Costs and Adjustment Responses. Energy Policy,31(14), 1519-1530.

Adenuga, O. A. (2013). Factors Affecting Quality in the Delivery of Public Housing Projects in Lagos State, Nigeria. International Journal of Engineering and Technology, 3(3), 332-344.

Ahmed, S. M., & Kangari, R. (1995). Analysis of Client-Satisfaction Factors in Construction Industry. Journal of Management in Engineering,11(2), 36-44.

Alarcon-Cardenas, L. F., & Ashley, D. B. (1992).Project Performance Modeling: A Methodology for Evaluating Project Execution Strategies (Vol. 80). Construction Industry Institute, University of Texas at Austin.

Arditi, D., & Gunaydin, H. M. (1998). Factors that Affect Process Quality in the Life Cycle of Building Projects. Journal of Construction Engineering and Management, 124(3), 194-203.

Chung, H. W. (2002). Understanding Quality Assurance in Construction: A Practical Guide to ISO 9000 for Contractors. Routledge.

Covey, S. (1989). The Seven Habits of Highly Successful People.Fireside/Simon & Schuster.

Crosby, P. B. (1992).Completeness: Quality for the 21st Century. Penguin.

Deming, W. E. (1986). Out of the Crisis, Massachusetts Institute of Technology. Center for Advanced Engineering Study, Cambridge, MA, 510. Elinwa, A. U., & Joshua, M. (2001). Time-Overrun Factors in Nigerian Construction Industry. Journal of Construction Engineering and Management, 127(5), 419-425.

Enshassi, A., Mohamed, S., & Abushaban, S. (2009). Factors Affecting The Performance of Construction Projects in the Gaza Strip. Journal of Civil Engineering And Management, 15(3), 269-280.

Ferguson, H., & Clayton, L. (1988). Quality in the Constructed Project: A Guideline for Owners, Designers and Constructors. ASCE, New York.

Ferguson, I., & Mitchell, E. (1986). Quality On Site. Batsford. George, D. (2003). SPSS For Windows Step by Step: A Simple Study Guide and Reference, 17.0 update, 10/e. Pearson Education India.

Heravitorbati, A., Coffey, V., Trigunarsyah, B., & Saghatforoush, E. (2011). Examination of Process to Develop A Framework for Better Implementation of Quality Practices in Building Projects.

Janipha, N. A. I., & Ismail, F. (2013). Conceptualisation of Quality Issues in Malaysian Construction Environment. Procedia-Social and Behavioral Sciences, 101, 53-61.

Juran, J. M., & Gryna, F. M. (1993). Quality Planning and Analisys.

Kubal, M. T. (1994). Engineered Quality in Construction. Partnering and TQM.

Kumaraswamy, M. (2006). Exploring the Legal Aspects of Relational Contracting. Journal of Professional Issues in Engineering Education and Practice, 132(1), 42-43. Love, P. E., & Irani, Z. (2003). A Project Management Quality Cost Information System for the Construction Industry. Information & Management, 40(7), 649-661. Moser, C. A., & Kalton, G. (1971). Survey methods in social investigation. Survey methods in social investigation., (2nd Edition).

Oberlender, G. D. (1993). Project Management for Engineering and Construction (Vol. 2). New York: McGraw-Hill.

Oyedele, L., Jaiyeoba, B., & Fadeyi, M. (2012). Design Factors Influencing Quality of Building Projects in Nigeria: Consultants' Perception. Construction Economics and Building, 3(2), 25-32.

Oyedele, L. O., Jaiyeoba, B. E., Kadiri, K. O., Folagbade, S. O., Tijani, I. K., & Salami, R. O. (2015). Critical Factors Affecting Construction Quality in Nigeria: Evidence from Industry Professionals. International Journal of Sustainable Building Technology and Urban Development, 6(2), 103-113.

Pike, R. J., & Barnes, R. J. (1995). TQM in Action: A Practical Approach to Continuous Performance Improvement. Springer Science & Business Media.

Rumane, A. R. (2010). Quality Management in Construction Projects. CRC Press.

Russell, J. S., & Skibniewski, M. J. (1990). QUALIFIER-1: Contractor Prequalification Model. Journal of Computing in Civil Engineering, 4(1), 77-90.

Shtub, A. (1995). Distributed Database for Project Control. International Journal of Project Management, 13(3), 173-176.

Sidwell, A. C. (1984). The Time Performance of Construction Projects. Architectural Science Review, 27(4), 85-91.

Sui Pheng, L., & Ke-Wei, P. (1996). A Framework for Implementing TQM in Construction. The TQM Magazine, 8(5), 39-46.

Wong, A. (1999). Total Quality Management in the Construction Industry in Hong Kong: A Supply Chain Management Perspective. Total Quality Management, 10(2), 199-208.

Downloads

Published

2018-01-25

Issue

Section

Articles

How to Cite

CRITICAL FACTORS AFFECTING QUALITY IN PUBLIC CONSTRUCTION PROJECTS IN BORNO STATE. (2018). Malaysian Journal of Civil Engineering, 29(1). https://doi.org/10.11113/mjce.v29.15588