IMPLEMENTING INDUSTRIALISED BUILDING SYSTEM (IBS) IN MALAYSIA: ACCEPTANCE AND AWARENESS LEVEL, PROBLEMS AND STRATEGIES
DOI:
https://doi.org/10.11113/mjce.v21.15784Keywords:
Industrialised Building System (IBS), Construction Industry, Precast Concrete and PrefabricationAbstract
Construction Industry Development Board (CIDB) has been actively promoting the use of Industrialised Building System (IBS) in Malaysian Construction Industry since 1998. Unfortunately, previous study was shown the use of IBS for building project in Malaysia only stands at 10% out of 50% as forecasted by CIDB in 2006. This research project explored the acceptance level of the current IBS implementation and existing problems faced by construction industry practitioners. It also identified suggestions to improve IBS implementation in Malaysia. The methods adopted for this study included interview and questionnaire survey. The study determined the level of IBS acceptance and awareness among Malaysian construction industry and analyzed root and frequent problems faced by the practitioners while implementing IBS. Based on the information gained, strategies to improve IBS implementation was suggested.References
Badir, Y.F., Abdul Kadir, M.R. and Hashim, A.H. (2002), “Industrialised Building Systems Construction in Malaysiaâ€, Journal of Architectural Engineering, Vol. 8, No.1
Blismas, N. (2007) Offsite Manufactured in Australia: current state and future direction, Corporative Research Centre for Construction Innovation, Brisbane
Chung, L. P. & Kadir, A. M. (2007) Implementation Strategy for Industrialized Building
System. Master thesis, Universiti Teknologi Malaysia (UTM), Johor Bahru
IBS Survey 2003 (2003), Construction Industry Development Board Malaysia (CIDB), Kuala Lumpur
Jamilus Hussein. Moving Construction up the Value Chain Using IBS. Malaysia IBS International Exhibition (MIIE 09) – International Seminar on IBS. January 21-23, 2009. Kuala Lumpur, Construction Industry Development Board Malaysia (CIDB). 2009. 2-6.
Noriwani & Azirudin Resang (2008) Critical Success Factor for IBS Adoption in Malaysian Construction Industry. Master Thesis, Universiti Technologi Malaysia (UTM), Johor Bahru
Construction Industry Development Board (CIDB) Malaysia (2007) Roadmap Review: Implementing The Ibs Roadmap 2003-2010, Construction Industry Development Board Malaysia (CIDB), Kuala Lumpur.
Thanoon, W. A. M., Peng, L. W., Abdul Kadir, M. R., Jaafar, M.S. and Salit, M.S. (2003), The Experiences of Malaysia and Other Countries in Industrialised Building System in
Malaysia, Proceeding on IBS Seminar, UPM, Malaysia
Warszawski, A. (1999) Industrialized and Automated Building System, Technion-Israel Institute of Technology, E & FN Spoon