RISK FACTOR IDENTIFICATION IN THE MANUFACTURING PROCESS OF HOLLOW CORE SLAB

Authors

  • Theresita Herni Setiawan Department of Civil Engineering, Faculty of Engineering Parahyangan Catholic University, Bandung. Jalan Ciumbuleuit 94 Bandung 40141, Indonesia
  • Ihzarmurafi Huza Sukarni Department of Civil Engineering, Faculty of Engineering Parahyangan Catholic University, Bandung. Jalan Ciumbuleuit 94 Bandung 40141, Indonesia

DOI:

https://doi.org/10.11113/mjce.v25.15858

Keywords:

Risk Identification, Hollow Core Slab.

Abstract

Risk management is an effort that needs to be done by a company to manage potential opportunities and adverse impact. Risk management activities are designed to assist the practitioner in identifying significant risks and implement follow-up and risk management process. The purpose of this research is to identify the risk factors related to the activities in the manufacturing process of Hollow Core Slab (HCS) by utilizing interview method and field observation method. This is then followed by grouping those factors based on the related aspects in Project Management Book of Knowledge (PMBoK). Based on the research analysis, there are twenty nine risk factors in the manufacturing process of HCS, which then grouped on the project management aspects of PMBoK, which three risk factors to the aspects of time, five risk factors to the aspects of procurement, seven risk factors to the aspects of quality, six risk factors to the aspects of equipment resources, and eight risk factors to the aspects of human resources

References

Departemen Pekerjaan Umum dan Tenaga Listrik. (1971). Peraturan Beton Bertulang Indonesia.PBI: N.I-2. Indonesia.

Elliot, Kim S. (2002). Precast Concrete Structures. Butterworth-Heinemann, Oxford.

Flanagan, Roger and Norman, George.(1993). Risk Management and Construction. Blackwell Science Ltd, United Kingdom.

Meredith, Jack R. and Mantel, Samuel J. (2010). Project Management A Managerial Approach.7th ed. John Wiley & Sons, Inc., USA.

Precast/Prestressed Concrete Institute. (1998). Manual For The Design of Hollow Core Slabs. PCI, Illinois.

Project Management Institute. (2004). A Guide To The Project Management Body of Knowledge. 3rd ed. PMI, Pennsylvania.

Sagel, R., Kole, P. danKusuma, Gideon H. (1993). Pedoman Pengerjaan Beton. Erlangga, Indonesia.

Sheppard, David A. and Phillips, William R. (1989).Plant-Cast Precast & Prestressed Concrete. McGraw-Hill Book Company, Inc., USA.

Staveren, M. v. (2006). Uncertainty and Ground Conditions: Risk Management Approach. 1st ed. Butterworth-Heinemann, Oxford.

Downloads

Published

2018-06-28

Issue

Section

Articles

How to Cite

RISK FACTOR IDENTIFICATION IN THE MANUFACTURING PROCESS OF HOLLOW CORE SLAB. (2018). Malaysian Journal of Civil Engineering, 25(2). https://doi.org/10.11113/mjce.v25.15858