VULNERABILITY ASSESSMENT OF BUILDING CONSTRUCTION PROJECTS
DOI:
https://doi.org/10.11113/mjce.v26.15888Keywords:
Vulnerability, building construction site, seismic risk, analytical hierarchy processAbstract
The present study deals with a vulnerability assessment carried on several Algerian buildings construction projects belonging to different seismic zones. The parameters governing the vulnerability of such buildings construction projects are identified. The priority order of these parameters is set using the Multiple Criteria Decision Making (MCDM) method, while a Partial Vulnerability Index (PVI) is proposed, to allow the identification of the intrinsic vulnerability. Finally, to enable a classification of the buildings according to their seismic vulnerability, a Global Vulnerability Index (GVI) is developed. The efficiency of the method was shown through several cases study which highlighted most vulnerable parameters. A classification between the different projects was also performedReferences
Abdelhamid, T.S. and Everett J.G. (2000) ‘Identifying root causes of construction accidents’, Journal of Construction Engineering and Management, Vol. 126, No. 1, pp. 52-60.
Akintoye, A.S. and MacLeod, M.J. (1997) ‘Risk analysis and management in construction, International Journal of Project Management, Vol. 15, No. 1, pp. 31-38.
Baccarini, D. and Archer, R. (2001) ‘The risk ranking of projects: a methodology’, International Journal of Project Management, Vol.19, No. 3, pp.139–145.
Brooks, N. (2003) Vulnerability, risk and adaptation: a conceptual framework, Tyndall Centre for Climate Change Research, Working Paper 38.
Chambers, R. (2006) ‘Vulnerability, coping and policy (Editorial Introduction)’, IDS Bulletin, Vol. 37, No. 4, pp.33–40.
Dikmen, I., Birgonul, M.T., Anac, C., Tah, J.H.M. and Aouad, G. (2008) ‘Learning from risks: a tool for post-project risk assessment’, Automation in Construction, Vol. 18, pp. 42-50.
Feng Y. (2013) ‘Effect on safety investments on safety performance of building projects’, Safety Science, Vol. 59, pp. 28-45.
Imriyas, K., Low, S.P. and Teo E.A.I. (2007) ‘A fuzzy knowledge-based system for premium rating of workers compensation insurance for building projects’, Construction Management and Economics, Vol. 25, pp. 1177-1195.
Kamal, M. and. Al-Subhi, A.H. (2001) ‘Application of the AHP in project management, International journal of project management, Vol. 19, No. 1, pp. 19-27.
Kelly, P.M. and Adger, W.N. (2000) ‘Theory and practice in assessing vulnerability to climate change and facilitating adaptation’, Climatic Change, Vol. 47, No. 4, pp.325-352.
Korkmaz, K.A., Sari, A., Suman, A. and Carhoglu, I. (2011) ‘Seismic risk assessment of storage tanks in Turkish industrial Industries’, Journal of Loss Prevention in the Process Industries,
Vol. 24, No. 4, pp. 314-320.
Lai, Y.T., Wang, W.C. and Wang H.H. (2008) ‘AHP and simulation based budget determination procedure for public building construction projects’, Automation in Construction, Vol. 17, No. 5, pp. 623-632.
Lee, E., Park, Y. and Shin, J.G. (2009) ‘Large engineering project risk management using a Bayesian belief network’, Expert Systems with Applications, Vol. 36, pp. 5880-5887.
Love, P.E.D. (2002) ‘Influence of project type and procurement method on rework costs in building construction projects’, Journal of Construction Engineering and Management,
January/February, pp. 18-29.
MH, Ministry of Housing (2003) Algerian seismic code RPA99 version 2003, Algeria.
Navneet, B. and Kanwal, R. (2004) Strategic decision making applying the Analytic Hierarchy Process, Springer.
Saaty, T.L. (1989) Group decision making and the AHP in analytic hierarchy process application and studies, Springer Vergla.
Saaty, T.L. (1990) Multicriteria decision making the analytic hierarchy process, Pittsburg RWS publication.
Salzano, E., Agreda, A.G., Di Carluccio, A. and Fabbrocino, G. (2009) ‘Risk assessment and early warning system for industrial facilities in seismic zones’, Reliability Engineering and System Safety, Vol. 94, No. 10, pp. 1577-1584.
Söderlund, J. (2004) ‘Building theories of project management: past research, questions for the future’, International Journal of Project Management, Vol. 22, pp. 183-191.
Teo, A.L.and Feng, Y. (2010) ‘The moderated effect of safety investment on safety performance for building projects’, The International Journal of Construction Management, Vol. 10, No.
, pp. 45-61.
Teo, A.L. and Feng, Y. (2011) ‘The indirect effect on safety investment on safety performance for buildings projects’, Architectural Science Review, Vol. 54, No. 1, pp. 65-80.
Triantaphyllou, E. and. Hman, S. (1995) ‘Using the analytic hierarchy process for decision making in engineering applications: some challenges’, International Journal of Industrial
Engineering: Application and Practice, Vol. 2, No. 1, pp. 35-44.
Tsai, C.H. and Chen, C.W. (2010) ‘An earthquake disaster management mechanism based on risk assessment information for the tourism industry-a case study from the island of Taiwan’,
Tourism Management, Vol. 31, pp. 470-481.
Turner, B.L., Kasperson, R.E., Matson, P.A., MacCarthy, J.J., Corell, R.W., Christensen, L., Eckley, N., Kasperson, J.X., Luers, A., Martello, M.L., Polsky, C., Pulsipher, A. and
Schiller, A. (2003) ‘A framework for vulnerability analysis in sustainability science’, Proceeding of the National Academy of Sciences of USA, Vol. 100, No. 14, pp. 8074–8079.
Watts, M.J. and Bohle, H.G. (1993) ‘The space of vulnerability: the causal structure of hunger and famine’, Progress in Human Geography, Vol. 17, No. 1, pp.43–67.
Williams, T.M. (1993) ‘Risk-management infrastructure’, International Journal of Project Management, Vol. 11, No. 1, pp.5–10.
Williams, T. (1995) ‘A classified bibliography of recent research relating to project risk management’, European Journal of Operational Research, Vol. 85, No. 1, pp.18–38.
Zahaf, A. and Bensaibi, M. (2011), ‘Estimation de la vulnérabilité sismique d’un chantier en Algérie’, First Moroccan Spanish Colloquium on Seismic Engineering, Tangier, Morroco.
Zahaf, A. and Bensaibi, M. (2012), ‘Gestion du risque sismique de chantier de bâtiment’, 18ème Congrès de Maîtrise des Risques et Sûreté de Fonctionnement, Tours, France, 2012.
Zeng, J., An, M. and Smith, N.J. (2007) ‘Application of a fuzzy based decision making methodology to construction project risk assessment, International Journal of Project Management, Vol. 25, pp. 589-600.
Zhang, H. (2007) ‘A redefinition of the project risk process: using vulnerability to open up the event-consequence link’, International Journal of Project Management, Vol. 25, pp. 694-