COST COMPARISON OF A SEWAGE TREATMENT PLANT UNIT BY CONVENTIONAL METHOD AND BIM APPROACH
DOI:
https://doi.org/10.11113/aej.v14.21303Keywords:
sewage treatment plant, manual quantity estimation, Building Information Modelling (BIM), BIM- quantity estimation, Cost estimation.Abstract
The large-scale sewage treatment plant (STP) projects are considered as complex infrastructure projects when compared to residential and commercial building projects. These complex projects need to have accurate estimation because cost estimate helps in tendering stage, pre construction stage and during the construction stage. This study compares the costs of a unit in an STP by using BIM software versus the conventional method. For BIM approach, to create a three-dimensional model of the STP unit using 2D floor plan, Revit software is used. Schedules of quantities are then produced under the schedule option in the software to calculate the cost of construction components. The result is, the percentage difference of quantities between the conventional method and BIM approach in excavation, PCC, footing, column, beam, slab, RCC wall, plaster, exterior paint, interior paint, railing, and steel is 0.41%, 0.39%, -0.15%, -0.03%, 0.33%, -0.05%, 0.38%, -2.37%, -2.47%, -2.10%, 0% and -3.48% respectively. The total estimated cost of STP unit by conventional method is Rs 74,13,845/- and Rs 74,97,461/- by BIM software respectively. The BIM-Assisted Detailed Estimating (BADE) tool's visualization and aggregation features in BIM significantly outperform the conventional method for the detailed estimate. BIM cost estimate is 1.12% more as compared to conventional method.
References
Sharma J R, Najafi M and Qasim S R 2013 Preliminary Cost Estimation Models for Construction, Operation, and Maintenance of Water Treatment Plants Journal of Infrastructre Systems 19: 451–64. DOI: https://doi.org/10.1061/(ASCE)IS.1943-555X.0000155
Hernandez-Sancho F, Molinos-Senante M and Sala-Garrido R 2011 Cost modelling for wastewater treatment processes Desalination 268: 1–5. DOI: https://doi.org/10.1016/j.desal.2010.09.042
Alzraiee H 2022 Cost estimate system using structured query language in BIM. International Journal of Construction Management. 22: 2731 43. DOI: https://doi.org/10.1080/15623599.2020.1823061
Kamal H and Bahgat M 2021 Implementation of AUTODESK REVIT in Design of Water Treatment Plants Proceeedings of the 4th International Conference on Building Information Modelling (BIM) in Design, Construction and Operations BIM 2021 (Santiago de Compostela, Spain) 97–104. DOI: https://doi.org/10.2495/BIM210081
Haider U, Khan U, Nazir A and Humayon M 2020 Cost Comparison of a Building Project by Manual and BIM Civil Engineering Journal. 6: 34–49. DOI: https://doi.org/10.28991/cej-2020-03091451
Chandak S 2016 Cost Optimization of Construction Projects using Building Information Modelling International Journal for Scientific Research and Development. 4: 1050–5
Elyano M R and Yuliastuti 2021 Analysis of clash detection and quantity take-off using BIM for warehouse construction IOP Conference Series: Earth and Environmental Science. 794: 012012. DOI: https://doi.org/10.1088/1755-1315/794/1/012012
Martins S S, Evangelista A C J, Hammad A W A, Tam V W Y and Haddad A 2022 Evaluation of 4D BIM tools applicability in construction planning efficiency International Journal of Construction Management, 22: 2987–3000. DOI: https://doi.org/10.1080/15623599.2020.1837718
Khosakitchalert C, Yabuki N and Fukuda T 2019 Improving the accuracy of BIM-based quantity takeoff for compound elements Automation in Construction. 106: 102891. DOI: https://doi.org/10.1016/j.autcon.2019.102891
Wang C, Lu W, Xi C and Nguyen X P 2019 Research on Green Building Energy Management Based on BIM and FM Nature Environment and Pollution Technology 18: 1641–6
M. Alsamarraie M and Ghazali F 2023 Cost-Benefit analysis of using BIM compared to traditional methods in Iraq’s public construction projects ASEAN Engineering Journal. 13: 107–14. DOI: https://doi.org/10.11113/aej.v13.18982
Söbke H, Peralta P, Smarsly K and Armbruster M 2021 An IFC schema extension for BIM-based description of wastewater treatment plants Automation in Construction, 129: 103777. DOI: https://doi.org/10.1016/j.autcon.2021.103777
Kretschmer F, Franziskowski S, Huber F and Ertl T 2023 Chances and barriers of building information modelling in wastewater management Water Science and Technology,. 87: 1630–42. DOI: https://doi.org/10.2166/wst.2023.079
Obaideen K, Shehata N, Sayed E T, Abdelkareem M A, Mahmoud M S and Olabi A G 2022 The role of wastewater treatment in achieving sustainable development goals (SDGs) and sustainability guideline Energy Nexus 7: 100112. DOI: https://doi.org/10.1016/j.nexus.2022.100112
Li J-L, Chen L-M and Xu H 2021 Intelligent Construction, Operation, and Maintenance of a Large Wastewater-Treatment Plant Based on BIM ed H Yao Advances in Civil Engineering. 2021: 1–11. DOI: https://doi.org/10.1155/2021/6644937
Vitásek S and Matějka P 2017 Utilization of BIM for automation of quantity takeoffs and cost estimation in transport infrastructure construction projects in the Czech Republic. IOP Conference Series: Material Science and Engineering 236: 012110. DOI: https://doi.org/10.1088/1757-899X/236/1/012110
Kim S, Chin S and Kwon S 2019 A Discrepancy Analysis of BIM-Based Quantity Take-Off for Building Interior Components. Journal of Management in Engineering 35: 05019001. DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000684
Khosakitchalert C, Yabuki N and Fukuda T 2020 Automated modification of compound elements for accurate BIM-based quantity takeoff Automation in Construction, 113: 103142. DOI: https://doi.org/10.1016/j.autcon.2020.103142
Wang D and Hu Y 2022 Research on the Intelligent Construction of the Rebar Project Based on BIM Applied Sciences, 12: 5596. DOI: https://doi.org/10.3390/app12115596
Wang J, Han X, Qun M and Luan F 2016 Research on the Application of BIM in Sewage Treatment Project Proceedings 5th International Conference on Sustainable Energy and Environment Engineering (ICSEEE 2016) (Zhuhai, China: Atlantis Press). DOI: https://doi.org/10.2991/icseee-16.2016.28
Kussumardianadewi B D 2020 Project Time Performance Upgrade by BIM 4D and Critical Chain Project Management Implementation on Waste Water Treatment Construction Project International Journal of Advanced Science and Technology. 29: 5768–77
Lin Y-C, Chen Y-P, Huang W-T and Hong C-C 2016 Development of BIM Execution Plan for BIM Model Management during the Pre-Operation Phase: A Case Study Buildings 6: 8. DOI: https://doi.org/10.3390/buildings6010008
Cheng Y M and Chen J Y 2013 Application of BIM on Quantity Estimate for Reinforced Concrete Applied Mechanics and Materials. 357 360: 2402 5. DOI: https://doi.org/10.4028/www.scientific.net/AMM.357-360.2402
Ilter D and Ergen E 2015 BIM for building refurbishment and maintenance: current status and research directions Structural Survey. 33: 228–56. DOI: https://doi.org/10.1108/SS-02-2015-0008
Nanagiri Y V and Singh R K 2015 Reduction of Wastage of Rebar by using BIM and Linear Programming International Journal of Technology. 5: 329. DOI: https://doi.org/10.5958/2231-3915.2015.00043.7
Pratoom W and Tangwiboonpanich S 2016 A Comparison of Rebar Quantities obtained by Traditional vs BIM-based methods Suranaree Journal of Science and Technology .23: 5–10
Putra A A P, Oei N I W, Hermawan and Hasiholan B 2022 Comparative Study in Bill of Quantity Estimates on Reinforcement Works of Pile Cap, Single Pier and Double Pier of Flyover Between Conventional Methods and BIM (Building Information Modelling) IOP Conference Series: Earth and Environmental Science. 1065: 012041. DOI: https://doi.org/10.1088/1755-1315/1065/1/012041
Shen Z and Issa R R A 2010 Quantitative evaluation of the BIM-assisted construction detailed cost estimates Journal of Information Technology in Construction (ITcon). 15: 234–57. DOI: http://www.itcon.org/2010/18