ANALYZING THE DYNAMICS OF CONTRACTOR FAILURES IN E-PROCUREMENT BASED CONSTRUCTION TENDERS: A CASE STUDY IN BANDA ACEH, INDONESIA

Authors

  • Hafnidar A. Rani Department of Civil Engineering, Engineering Faculty, Universitas Muhammadiyah Aceh, 23245, Banda Aceh, Aceh, Indonesia https://orcid.org/0000-0002-7417-0083
  • Tamalkhani Syammaun Department of Civil Engineering, Engineering Faculty, Universitas Muhammadiyah Aceh, 23245, Banda Aceh, Aceh, Indonesia
  • Rudi Rifaldi Department of Civil Engineering, Engineering Faculty, Universitas Muhammadiyah Aceh, 23245, Banda Aceh, Aceh, Indonesia
  • Afizah Ayob Faculty of Civil Engineering and Technology, Universiti Malaysia Perlis, 02600, Arau, Perlis, Malaysia
  • Muhammad Shafly Aqsha Faculty of Computer Science, Universiti Tun Hussein Onn Malaysia, 86400, Parit Raja, Johor, Malaysia

DOI:

https://doi.org/10.11113/aej.v15.22083

Keywords:

E-procurement, construction tenders, contractor failure, tendering process, government tenders

Abstract

The inefficiencies in the e-procurement tender process have become a critical issue for government construction projects in Banda Aceh, Indonesia, leading to a high incidence of contractor failures. This research investigates the underlying factors contributing to these failures, aiming to identify the primary influences and their relative impacts. The study employs a comprehensive methodological approach, including descriptive analysis, factor analysis, and multiple linear regression analysis. Key findings reveal that administrative factors (X1) and qualification factors (X4) significantly contribute to contractor failures. However, the analysis shows that technical competence (X2) is the most influential factor. The regression analysis results in the equation Y = 5.213 + 0.797X1 + 1.061X2 + 0.609X3 + 0.280X4, with a coefficient of determination (R2) of 0.955. This indicates that 95.50% of the variability in contractor failure rates can be explained by the variables of administration, technical competence, pricing strategy, and qualification. This study contributes to a better understanding of contractor failures in e-procurement dynamics and provides actionable insights that can enhance the efficiency and success of future tender processes.

References

Rani, H. A. 2016. Manajemen proyek konstruksi. Deepublish.

Suhartono. 2012. Sektor konstruksi nasional dan perubahan undang-undang nomor 18 tahun 1999 tentang jasa konstruksi. Jurnal Ekonomi & Kebijakan Politik. 3(1): 137-163. https://jurnal.dpr.go.id/index.php/ekp/article/view/175

Malik, A. 2010. Pengantar bisnis jasa pelaksana konstruksi: Kiat anda meraih sukses pada bisnis kontraktor. Andi Offset.

Schotanus, F., van den Engh, G., Nijenhuis, Y., and Telgen, J. 2022. Supplier selection with rank reversal in public tenders. Journal of Purchasing and Supply Management. 28(2): 100744 DOI: https://doi.org/10.1016/j.pursup.2021.100744

Faraji, A., Rashidi, M., Eftekhari, N. A., Perera, S., and Mani, S. 2022. A bid/mark-up decision support model in contractor’s tender strategy development phase based on project complexity measurement in the downstream sector of petroleum industry. Journal of Open Innovation: Technology, Market, and Complexity. 8(1): 33. DOI: https://doi.org/10.3390/joitmc8010033

Almohassen, A. S., Alfozan, M., Alshamrani, O. S., and Shaawat, M. E. 2023. Evaluating construction contractors in the pre-tendering stage through an integrated based model. Alexandria Engineering Journal. 82: 437-445. DOI: https://doi.org/10.1016/j.aej.2023.09.069

Peraturan Presiden Republik Indonesia Nomor 12 Tahun 2021 Atas Perubahan Peraturan Presiden Republik Indonesia Nomor 16 Tahun 2018 Tentang Pengadaan Barang/Jasa Pemerintah. https://peraturan.bpk.go.id/Details/161828/perpres no 12 tahun 2021

Peraturan Kepala Kebijakan Pengembangan Jasa Konstruksi (LKPP) Nomor 2 Tahun 2010 Tentang Layanan Pengadaan Secara Elektronik.

https://jdih.lkpp.go.id/regulation/peraturan-kepala-lkpp/peraturan-kepala-lkpp-nomor-2-tahun-2010

LPSE Provinsi Aceh. 2020. https://lpse.acehprov.go.id/eproc4 Retrieved on 03 February 2024

Abimantara, G. C., and Purwito, A. 2019. Analisa kegagalan kontraktor dalam proses tender system E-procurement pada proyek Pemkot Surabaya. Axial: Jurnal Rekayasa dan Manajemen Konstruksi. 7(1): 33-41. DOI: https://doi.org/10.30742/axial.v.7i1.706

Karyasa, I. N. R., Salain, I. M. A. K., and Nadiasa, M. 2014. Analisis faktor-faktor yang mempengaruhi gagal lelang pengadaan barang dan jasa pemerintah secara elektronik (e-procurement) di Kabupaten Badung. Jurnal Harian Regional. Jurnal Spektran. 2(1): 19-27. DOI: https://doi.org/10.24843/SPEKTRAN.2014.v02.i01.p03

Simalango, D. R., and Setiawan, H. 2019. Faktor-faktor penyebab kegagalan kontraktor dalam evaluasi penawaran di Daerah Istimewa Yogyakarta. Jurnal Teknik Sipil. 15(3): 133-142. DOI: https://doi.org/10.24002/jts.v15i3.3726

Putri, V. R., Dewantoro, and Puspasari, V. H. 2023. Faktor-faktor penyebab kegagalan penyedia jasa pada proses evaluasi penawaran tender konstruksi. Jurnal Basement. 1(1): 17-24. https://e-journal.upr.ac.id/index.php/basement/article/view/8245

Peraturan Menteri PUPR Nomor 14 Tahun 2020 Tentang Standar dan Pedoman Pengadaan Jasa Konstruksi Melalui Penyedia. https://peraturan.bpk.go.id/Details/159651/permen-pupr-no-14-tahun-2020

Singh, P. K., and Chan, S. W. 2022. The impact of electronic procurement adoption on green procurement towards sustainable supply chain performance - Evidence from Malaysian ISO organizations. Journal of Open Innovation: Technology, Market, and Complexity. 8(2): 61. DOI: https://doi.org/10.3390/joitmc8020061

Kshaf, D. A., Mohamed, M. A., and El-Dash, K. M. 2022. The major problems between main contractors and subcontractors in construction projects in Egypt. Ain Shams Engineering Journal. 13(6): 101813. DOI: https://doi.org/10.1016/j.asej.2022.101813

Lenderink, B., Halman, J. I. M., Boes, J., Voordijk, H., and Dorée, A. G. 2022. Procurement and innovation risk management: How a public client managed to realize a radical green innovation in a civil engineering project. Journal of Purchasing and Supply Management. 28(1): 100747DOI: https://doi.org/10.1016/j.pursup.2022.100747

Blasco, D. K., Saukkonen, N., Korhonen, T., Laine, T., and Muilu-Mäkelä, R. 2021. Wood material selection in school building procurement – A multi-case analysis in Finnish municipalities. Journal of Cleaner Production. 327. DOI: https://doi.org/10.1016/j.jclepro.2021.129474

Arifin, Z., and Juwanti, D. 2013, October. Studi Harga Penawaran dan Faktor Penentu Pemenang Tender Proyek Konstruksi di DIY Untuk Kualifikasi Non Kecil. In Prosiding Konferensi Nasional Teknik Sipil 7, Universitas Sebelas Maret, Surakarta, Indonesia, 243-250. https://docplayer.info/29695502-Studi-harga-penawaran-dan-faktor-penentu-pemenang-tender-proyek-konstruksi-di-diy-untuk-kualifikasi-non-kecil-234k.html

Mahamid, I. 2024. Effect of conflicts on the contracting business failure in the construction industry. Journal of King Saud University - Engineering Sciences 36(7): 498-503. DOI: https://doi.org/10.1016/j.jksues.2023.12.003

Shrestha, R., Kadel, R., and Mishra, B. K. 2023. A two-phase confirmatory factor analysis and structural equation modelling for customer-based brand equity framework in the smartphone industry. Decision Analytics Journal. 8. DOI: https://doi.org/10.1016/j.dajour.2023.100306

Downloads

Published

2025-05-31

Issue

Section

Articles

How to Cite

ANALYZING THE DYNAMICS OF CONTRACTOR FAILURES IN E-PROCUREMENT BASED CONSTRUCTION TENDERS: A CASE STUDY IN BANDA ACEH, INDONESIA. (2025). ASEAN Engineering Journal, 15(2), 59-65. https://doi.org/10.11113/aej.v15.22083